Skip to main content
URBAN ECOTOPIACLIMATE INTELLIGENCE · LONDONCheck pilot fit

DESIGNED TO WITHSTAND QUESTIONS

The product is not only the map. It is the retained record.

The proposed evidence pack would keep what was observed, how it was processed, what remains uncertain and who approved its use attached to the decision. The public dossier below records what the local prototype can and cannot currently establish.

ALLOW-LISTED · DETERMINISTIC · PUBLIC-SAFE

A machine-readable record of the current claim boundary.

Download JSON dossier
Company
Urban Ecotopia Ltd
Company number
17380717
Product family
Climate Intelligence
Tender project
Urban Heat Adaptation Decision Sprint
Commercial service
Site Heat Evidence Review
Schema
public-evidence-dossier/v1
WORKING EVIDENCE · SYNTHETIC

Matched EO decision rehearsal

Contract, structure and reproducibility checks pass locally. No professional review was performed and this record has no decision or tender-gate authority.

Experiment
urban-heat-synthetic-execution-v1
State
contract valid locally
Bound artefacts
9
Gate effect
none
Result SHA-256
f611a611c3705018d4f4ae733bb5464455736dd38a2a2c880b2348892150b615
nowDecision evidence foundation

Local evidence contracts, method controls, source-linked research retrieval and human-release boundaries.

method defined
proposed pilotOne authorised site

One rights-cleared historic EO baseline, one limited option set and one evaluated decision with a qualified reviewer.

validation gate open
after validationRepeatable evidence method

Cross-case reuse remains conditional on authorised cases demonstrating utility, rights clearance and delivery economics.

future horizon

OPEN EVIDENCE

What must still be earned

  • OPEN

    A named, authorised site and rights-cleared observed inputs.

  • OPEN

    A retained customer protocol and attributable evaluation of decision usefulness.

  • OPEN

    Independent scientific review of the selected method, support and interpretation boundary.

  • OPEN

    Documented authority, source rights and asset-specific IP chain of title.

  • OPEN

    Observed buyer intent, accepted scope, delivery economics and price evidence.

  • OPEN

    Every submission gate closed in the controlled application pack.

UNSUPPORTED CLAIMS

What this product does not establish

  • NOT ESTABLISHED

    Observed site performance or realised cooling

  • NOT ESTABLISHED

    Customer validation, commercial demand or willingness to pay

  • NOT ESTABLISHED

    Scientific validity, causal impact or model transferability

  • NOT ESTABLISHED

    Tender eligibility, legal clearance, IP ownership or regulatory compliance

  • NOT ESTABLISHED

    Grant readiness, endorsement, selection or award

  • NOT ESTABLISHED

    Proof that Earth observation is indispensable

  • NOT ESTABLISHED

    Planning approval, building compliance, certification or professional decision authority

  • NOT ESTABLISHED

    Validated financial loss, asset valuation or insurance pricing

Local structural and reproducibility validation is implementation evidence only. It is not customer validation, scientific validation, legal validation or grant validation.

FIVE REQUIRED FIELDS

Every candidate priority carries its limits.

No source permission, no acquisition.No accountable review, no release.
  1. 01
    Source

    Publisher, product, version, observation date and spatial support.

  2. 02
    Rights

    Permitted access, use, transformation, attribution and output conditions.

  3. 03
    Method

    Process identity, assumptions, comparison rule and validity boundary.

  4. 04
    Uncertainty

    Coverage, missingness, sensitivity and unresolved evidence.

  5. 05
    Review

    Named role, decision, review state and release record.

VERSIONED AND REVIEWABLE

Evidence remains attached at every hand-off.

PROPOSED INTEROPERABILITY PATTERNInspect one evidence item.OKF v0.2 informed · no trust score · no measured result
SOURCE RECORDS

Rights remain a separate mandatory gate.

EVIDENCE CONCEPTSite heat observation
type
EO evidence record
sources
linked and attributable
generated
actor and time recorded
verified
scope remains visible
status
draft · current · superseded
DECISION RECEIPTPROFESSIONAL REVIEW
RELEASENARROWSTOP
Named role · review date · bounded decision
01 / SOURCEEO acquisition and processing record

product · observation date · spatial support

A recorded source does not establish permitted commercial use.

WHAT THE PACK DOES NOT DETERMINE

A more defensible hand-off, not an automated verdict.

  • Indoor overheating or thermal comfort from EO alone
  • Part O, TM52 or TM59 compliance
  • Planning approval or engineering feasibility
  • Certified simulation or guaranteed cooling
  • Realised resilience or emissions outcomes
  • Automated professional judgement
  • Insurer pricing, disclosure filing or solvency conclusions without specialist review