DECISION BEFORE DATA
A controlled route from observation to professional review.
The method begins with one site decision, not a model. The site, options, evaluator, usefulness endpoint and release authority are fixed before Earth observation is tested.
EARTH OBSERVATION · PHYSICS · EXPLAINABLE AI · REVIEW
Evidence moves. Authority does not.
A proposed scientific workflow for turning archived climate signals into reviewable site evidence. Motion reveals each analytical hand-off and the limits that travel with it.
- Surface signal
- Vegetation
- Missing or masked
LST ≠ AIR TEMPERATURE ≠ THERMAL COMFORT
- BUILDING FORM
- STREET TOPOLOGY
- CANOPY + SURFACE
- SOLAR + SKY VIEW
- SOCIAL CONTEXT
MODELLED CHANGE · NOT REALISED COOLING
- SOURCE RECEIPTDATE · LICENCE · UNIT
- VALIDATION CARDSPATIAL HOLD-OUT · SCALE
- EXPLANATIONMODEL FEATURE ATTRIBUTION
- UNCERTAINTYMISSING · OUT OF DOMAIN
MODEL FEATURE ATTRIBUTION ≠ CAUSAL EXPLANATION
THE MODEL CANNOT RELEASE ITS OWN RESULT
- 01SOURCERights · date · unit
- 02REGISTERTime · grid · coverage
- 03DERIVEPhysical features
- 04MODELSpatial validation
- 05EXPLAINReason · uncertainty
- 06RELEASEHuman decision
Separate historic land-surface temperature, vegetation, urban form and social context. Cloud, coverage and source rights remain visible.
OBSERVATION IS NOT OUTCOME
Keep every inference boundary visible.
Earth observation, derived indicators, place representations, scenarios, model attribution and professional judgement are different objects. No arrow between them is automatic.
- 01OBSERVED EOSatellite acquisition
Sensor, date, time, unit and coverage
Not air temperature or comfort - 02DERIVED INDICATORSurface evidence
Documented processing and spatial support
Not a causal mechanism - 03EMBEDDINGOptional retrieval feature
Validated similarity for a defined task
Not suitability or causality - 04MODELLED SCENARIOBounded comparison
Fixed options, inputs and assumptions
Not realised cooling - 05FEATURE ATTRIBUTIONModel explanation
Contribution under one fitted model
Not physical explanation - 06PROFESSIONAL JUDGEMENTReview and release
Named role, date, scope and decision
Not implementation - 07REALISED OUTCOMEMonitoring after delivery
Independent observed evaluation
Not available in this concept
CHANGE IS NOT IMPROVEMENT
EO is judged against a pre-registered usefulness endpoint.
The non-EO and EO arms use the same site, options, spatial support and evaluator. An independent review asks whether the added observation improves a stated decision need, such as admissible prioritisation, confidence, evidence-gap closure, monitoring design or auditability. A ranking change alone does not pass.

- 01 Roof treatment
- 03 Shade structure
- 05 Canopy cooling
- 06 Permeable ground
Establish the comparator before adding another spatial signal.
Test whether priority, confidence, gaps or auditability materially change.
FAIL CLOSED
The method can narrow, abstain or stop.
- 01Source rights are not approved
- 02Observation scale cannot support the site question
- 03Coverage or quality is inadequate
- 04EO does not improve the pre-registered decision endpoint
- 05Required specialist modelling is unavailable or unvalidated
- 06The accountable reviewer rejects the evidence